Description
Features and performance
Reaction to fire
Euroclass A1 according to standard UNE-EN 13501-1:2019
Colours and dimensions
Dimensions
High-performance linear metal ceiling system consisting of vertical baffles with a rectangular cross-section and 90º edges, suspended in parallel from a concealed support structure with an optional safety tab depending on the model. Each element can be removed individually. The width of the baffles and the spacing between them vary depending on the model.


Installation and cleaning
- The elements of any THU system must be stored in dry, well-ventilated areas, away from heat sources and protected from direct sunlight and rain.
- THU products are tested for indoor use, without direct exposure to the weather or to the temperature and humidity cycles of outdoor conditions.
- Installation shall begin only once the building (or the relevant area of it) is wind- and watertight, all traces of moisture have disappeared and ambient conditions are suitable in terms of temperature (15 to 25 ºC) and humidity (35 to 70%).
- Once installed, no element should show any remains of packaging, protective film, surface marks or handling stains.








